Electrical Balance of Plant

Every volt matters. Convert energy with ease while we retain your electrical network distribution flow.

Optimize the electrical balance of your plant.

Should there be a defect in any component of your electrical system, site operations will be negatively affected and result in a loss of energy production. This increases operational expenses and consequently puts your solar farm at risk of energy and revenue loss.

At Anairsun, we ensure the electrical balance of plant through components including overhead lines, underground cables and switchgear optimally connected and maintained for practical energy production. Our team instils measures that ensure operations never come to a halt through high technical maintenance.

Our service scope includes:

Inspection and tests

Visual inspection of gauges, leaks, interior control devices and diesel generators followed by functionality tests on electrical and pressure switches.

Switchgear bus and enclosure maintenance

Lubrication of mechanicals and cleaning of exterior equipment is performed, leak current and check alarm levels are measured, and oil samples are drawn for analysis and evaluation. These tests are done on a weekly to an annual basis.

Substation service transformers maintenance

Electrical and TRR testing is conducted on voltage transformers. Vacuum breakers are also inspected, cleaned, and lubricated. Insulation and contact resistance tests at SANS-approved levels are done from phase to ground with the breaker open and closed. PF tests are also conducted on all blushing lighting arrestors, if applicable.

Instrument transformers

Ratio tests are done through primary injection and confirmation of secondary loop connections and devices. Insulation, dissipation, and bridge capacitor tests are done at CCVT only.

Scheduled power outages

After consultation, we provide a scheduled outage maintenance plan to accommodate both parties regarding major maintenance outages forecasted to occur within the year.

Battery bank and charges

Battery testing is done annually, quarterly, and semi-annually to perform load bank testing that measures individual cell voltage and inter-cell resistance accordingly to ensure relevant parameters are set to optimise battery bank and charger performance.

Switching operations

The switching of operations shall be conducted according to your communication protocols. With your consent, Anairsun will gather relevant party details and coordinate the switching of operations with Eskom. A representative will physically be on-site during the outage operations- disconnections and connections of the plant.

Reporting

We provide daily to monthly reports of preventative or corrective maintenance activities. Reports detail consumed spare parts, inventory loss and estimated costs for purchasing the necessary spare parts. We also include health, safety and environmental reports on incidents that may have occurred during operations.

CONTACT US

Don’t let ineffective electrical networks increase revenue loss.

Other Services

Renewing Tomorrow Today

Let’s do better, together.

Anairsun brings internationally recognised practices that keep your solar farm profitable.